Sep 10

Millicents, so far

IMG_2807.JPG

My Millicents are coming on fairly well, considering how limited my knitting time has been recently. Today I finally finished the cuff of the second sock, and have about 2cm more ribbing than I do in the photos.

I put them on to stretch out the lace pattern for photos, but when they’re done, the lace will be the other way up, folded down over the 2X2 ribbing, more like this:

IMG_2810.JPG

So right now I am essentially knitting a bit that will be forever hidden. Never seen. And yet it is still a good 15cm (per sock!) that needs knitting. sigh. But they’re so pretty!

IMG_2811.JPG

The ribbing on the longer one is about halfway there, I’m pointing at it in this pic. Please excuse the bright white legs.

I’m really enjoying working with the Louet gems. I haven’t found any knots (and I’ve balled up 4 skeins) and it isn’t splitting. The colour is also wonderful. I think I’m going to need to find some really cool shoes to wear these with.

IMG_2812.JPG

I started these socks as part of Ravelry’s Sockdown!, being held in the Sock Knitters Anonymous group. Basically, a set of ‘rules’ is laid down which gives each month (starting this August) a designer and a technique (August was Sockbug or lace). You finish a pair of socks by that designer, or using that technique by the deadline, and are entered to win prizes. August was lace, and the deadline is September 30th. Back when I started, I calculated that I’d need to knit at least 2.5cm per day to make it. If that was true, I’d be more than half done. I’m about 25% done, with close to 0 knitting time on the horizon until about the 21st. I think I may have been to ambitious (especially considering I knew what a timesuck my new job would be), but there is still a chance. The rest of the socks are just ribbing, no more following a chart.

IMG_2808.JPG

Once both legs are decreased a bit (after 12.5cm of straight ribbing, each…argh) I want to put them both on one circular. I tried that when casting on, and it was just a huge mess, mainly because the circ I have isn’t quite long enough for two socks the circumference of my calves. Once they get to normal sock size, it should be okay.

Having these just be ribbing now means that both projects I have on the go are simple TV-projects. If these weren’t on a deadline, I’d start something new…

PS: The socks I’m going to start in October (Nancy Bush or cables)? Bayerische, both at the same time on one circular. Am I crazy? At least I was sane enough to not even try doing anything for the challenge in September (Grumperina or toe-up).

2
comments

2 comments!!!

  1. May says:

    I missed out on Sockdown August. can you join in at any time? or have to do the whole year? Yours looks nice so far. :)

Reply